@ -214,14 +214,13 @@ PID-based (Proportional-Integral-Derivative) control strategy combined with dist
|
||||||
assistance based on system dynamics.
|
assistance based on system dynamics.
|
||||||
|
|
||||||
|
|
||||||
% ************************************** LOW TECH SIX STEP CONTROL *****************************************************
|
% ***************************** Hardware-Based Six-Step Commutation Controller ****************************************
|
||||||
|
|
||||||
|
|
||||||
\section{Hardware-Based Six-Step Commutation Controller}
|
\section{Hardware-Based Six-Step Commutation Controller}
|
||||||
\label{sec:sixstep}
|
\label{sec:sixstep}
|
||||||
|
|
||||||
|
|
||||||
% ************************************** FIELD ORIENTED CONTROL *****************************************************
|
% ***************************** STM32-Based Field-Oriented Control Motor Drive *****************************************
|
||||||
|
|
||||||
\section{STM32-Based Field-Oriented Control Motor Drive}
|
\section{STM32-Based Field-Oriented Control Motor Drive}
|
||||||
\label{sec:foc}
|
\label{sec:foc}
|
||||||
|
|
@ -364,7 +363,6 @@ assistance based on system dynamics.
|
||||||
development. Once routing is completed, the board will be manufactured
|
development. Once routing is completed, the board will be manufactured
|
||||||
and tested with the VESC firmware adapted to the L476 tile.
|
and tested with the VESC firmware adapted to the L476 tile.
|
||||||
|
|
||||||
|
|
||||||
% ************************************** SOFTWARE AND CONNECTIVITY *****************************************************
|
% ************************************** SOFTWARE AND CONNECTIVITY *****************************************************
|
||||||
|
|
||||||
\section{Software and Connectivity}
|
\section{Software and Connectivity}
|
||||||
|
|
@ -448,8 +446,8 @@ for the the MAD associates.
|
||||||
|
|
||||||
% ************************************ DYNAMIC MODELLING ***************************************************************
|
% ************************************ DYNAMIC MODELLING ***************************************************************
|
||||||
|
|
||||||
\section{Dynamic Modelling and Control of the Bicycle-Cargo System}
|
|
||||||
|
|
||||||
|
\section{Dynamic Modelling and Control of the Bicycle-Cargo System}
|
||||||
\subsection{Dynamic System Modelling}
|
\subsection{Dynamic System Modelling}
|
||||||
|
|
||||||
The studied system consists of a bicycle towing a cargo cart through a rigid mechanical linkage. This link is only used
|
The studied system consists of a bicycle towing a cargo cart through a rigid mechanical linkage. This link is only used
|
||||||
|
|
@ -614,33 +612,6 @@ However, due to the absence of direct velocity measurements during the experimen
|
||||||
be extracted from these tests. Consequently, a precise estimation of dynamic friction parameters and energy efficiency
|
be extracted from these tests. Consequently, a precise estimation of dynamic friction parameters and energy efficiency
|
||||||
could not be achieved.
|
could not be achieved.
|
||||||
|
|
||||||
\subsection{FOC Controller Validation}
|
|
||||||
|
|
||||||
\subsubsection{Current Status Summary}
|
|
||||||
|
|
||||||
Table~\ref{tab:foc_status} summarizes the current status of the FOC
|
|
||||||
controller development.
|
|
||||||
|
|
||||||
\begin{table}[htbp]
|
|
||||||
\caption{FOC controller development status}
|
|
||||||
\label{tab:foc_status}
|
|
||||||
\centering
|
|
||||||
\begin{tabular}{l c}
|
|
||||||
\toprule
|
|
||||||
\textbf{Task} & \textbf{Status} \\
|
|
||||||
\midrule
|
|
||||||
VESC firmware compilation & Completed \\
|
|
||||||
Pin compatibility (F405 / L476) & Completed \\
|
|
||||||
Schematic design (KiCad) & Completed \\
|
|
||||||
ERC validation & Completed \\
|
|
||||||
PCB routing & In progress \\
|
|
||||||
Tile footprint correction & In progress \\
|
|
||||||
Board manufacturing & Planned \\
|
|
||||||
Hardware testing & Planned \\
|
|
||||||
\bottomrule
|
|
||||||
\end{tabular}
|
|
||||||
\end{table}
|
|
||||||
|
|
||||||
|
|
||||||
% ******************************** DISCUSSION **************************************************************************
|
% ******************************** DISCUSSION **************************************************************************
|
||||||
|
|
||||||
|
|
@ -681,7 +652,6 @@ impose a tripping hazard. There, an encapsulation of an encrypted control frame
|
||||||
Based on the results obtained and the limitations identified during this
|
Based on the results obtained and the limitations identified during this
|
||||||
project, several directions for future work are proposed.
|
project, several directions for future work are proposed.
|
||||||
|
|
||||||
>>>>>>> 9c1f96ca2cf4e79662cccb061b48216d25c523c2
|
|
||||||
\subsection{Hardware Completion and Testing}
|
\subsection{Hardware Completion and Testing}
|
||||||
The VESC-based FOC PCB requires routing completion and prototype
|
The VESC-based FOC PCB requires routing completion and prototype
|
||||||
manufacturing. Once fabricated, the board must be tested under real
|
manufacturing. Once fabricated, the board must be tested under real
|
||||||
|
|
@ -707,7 +677,6 @@ operating conditions (varying loads, road profiles, and battery voltage).
|
||||||
%quantities and units. For example, write ``Temperature (K)'', not
|
%quantities and units. For example, write ``Temperature (K)'', not
|
||||||
%``Temperature/K''.
|
%``Temperature/K''.
|
||||||
|
|
||||||
|
|
||||||
% ******************************** REMERCIEMENTS **************************************************************************
|
% ******************************** REMERCIEMENTS **************************************************************************
|
||||||
|
|
||||||
\section*{Acknowledgment}
|
\section*{Acknowledgment}
|
||||||
|
|
|
||||||
Loading…
Reference in a new issue